Laying indoor sport rubber flooring


The main requirements are as follows:

1. A surface clean of dust and construction waste, even and aligned. Installation over putty, which is partially unglued or/and uneven. There should not be any spots from paint, oil, plaster, etc.

2. It is necessary for the sub-floor to be dry. The permissible sub-floor humidity is 3%CM, air humidity - up to 75%.

3. The room temperature should be between +15 и +25 ºС

4. Finishing works on the drywalls are not allowed, as well as major painting jobs. Paint corrections are allowed - if necessary, but protection for the flooring should be ensured.

Flooring installation includes the following actions:

1. Shipping of materials to the site

2. Unpacking of the rolls and obligatory check for defects and color differences. Materials stay in the room at least 24 hours before the cutting.

3. Cleaning of the sub-floor from dust and other contaminations.

4. Cutting the flooring.

5. Laying the flooring and glueing it.

6. Making the outlines. It depends on the type of playground - tennis, basketball, multifunctional, etc.

The following actions are not included in installation:

1. Floor cleaning after installation.

2. If the client requests, we are able to deliver and install other basketball, football, etc. equipment.

 